RSS facility onboarding
Worksurface
515m2 (5543ft2)
Working height
8m (26ft)
Power supply
1 x 125 Ampère & 2 x 63 Ampère
Outside power (craft services)
1 x 32 Ampère (exterior socket)
L.E.D. curved screen
14 x 5.5m (46 x 18ft)
L.E.D. mobile/movable screen
3 x 3m (10 x 10 ft)
The L.E.D. curved screen is approx. 3.5m (11ft) from the back wall of the studio, allowing for placement of (back)light sources.
Technical roof
8x 250kg electric hoists with 8 channel contoller
rolling lateral on 4 beams
Truss
4x 12m H300V hung in 4 lanes
(can be split into 16x 3m pieces)
Power
Lighting/grip can use either 125A, 63A or 32A outlets distributed troughout the studio. The 63A outlets are located on the catwalk surrounding the studio, the 32A is shared with the truss hoists. See picture below:

Camera, MuaH, Styling, Production, etc… Can use the 2kw shucko outlets scattered troughout the studio. Please only plugin office equipment or chargres. No heaters except when discussed before hand!
Hoists and Trusses
We have 8x 250kg electric hoists available in the studio. The hoists are on rollers and roll over the entire length of the studio on 4 steel beams. The hoists are controlled with a control box located next to the 32A outlet on the left side of the studio. All 8 motors can be controlled separately and simultaneously.
There are 4x 12m H30V trusses available that can be separated into 3m pieces.
The default configuration of the hoists and trusses are 4x 12m horizontal beams which hang in 2 motors on each end. In the standard configuration each 12m beam can support up to 500 kg lifting capacity, for the truss capacity please refer to this website . This standard configuration is allowed to be changed by the gaffer/rigger as long as the default configuration is put back at the end of production.

Maximum ceiling and floor load
The maximum load of the ceiling is 1000kg per span. spans are 5.7m apart and marked on the diagram above. The maximum load of the floor is 1000kg per 1m².
The dimensions of the entrance is 3m x 3,75m (WxH). Lighting trucks generally can enter the studio as long as everything is taken of the roof of the truck and the suspension is pneumaticly lowered.
Catering
Catering can place their truck/van in front of the studio on the yellow markings. There is a water, sewage and 32A 3 phase power point placed beside it.

Catering can also use the kitchen and canteen space upstairs please return all kitchen equipment, plates and cutlery.

Coffee
There is a Coffee machine available for crew that brews regular coffee, espreso, cappucino and hot water for tea. Please put the empty cups in the empty cups bin next to the coffee machine. If the water is empty there is a reservoir on the left that you can fill yourself either in the kitchen or from the toilet sink.

Trash disposal
Please put all trash in trash bins either inside the studio, or outside in the big container. Trashbins get emptied out everyday, if the container is full please give us a shout and we will arange for a new one. This container is not to be used for any material art/production design brings, they should arrange for their own trash disposal. Please put all sigaret buds either straight into the container or provide a colletion bin outside.

Parking
Parking is provided for trucks/vans with gear in front of the studio. Parking for crew and cast is provided at the front of the studio lot.
